FDEP Final Test Report — Spring Lake WWTP Pilot
Eight weeks at an operating Florida wastewater plant: four weeks internal, four weeks certified. Composite samples three times a week at five points across the treatment train, analyzed by Eurofins. Full results for suspended solids, nutrients, CBOD, coliform, PFAS and the complete EPA primary and secondary drinking water panel, with lab methods and the underlying reports. This is the source document behind every performance figure Eco publishes.


